Showing below up to 50 results in range #1 to #50.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)

  1. 1. General Requirements
  2. 1. Introduction
  3. 2. Surface Drainage Project Recommendations
  4. 3. Subsurface Drainage Project Recommendations
  5. A. Acronyms
  6. A. Background and Overview to Chapter 1
  7. A. Chapter Organization
  8. A. Chapter Purpose
  9. A. Determining Benefits for Tribal, Government, or Public Lands
  10. A. Drainage Code Appeals
  11. A. Drainage Liens
  12. A. Easements and Rights-of-Way
  13. A. General
  14. A. General (Section 2. II)
  15. A. General (Section 2. III)
  16. A. General (Section 2. IV)
  17. A. General (Section 2. V)
  18. A. General (Section 2. VI)
  19. A. General (Section 3. II)
  20. A. General (Section 3. III)
  21. A. General (Section 3V)
  22. A. General (Section 3VI)
  23. A. General (Section 3VII)
  24. A. General (Section 3 IV)
  25. A. General (Section II)
  26. A. Introduction to Chapter 2
  27. A. Jurisdiction
  28. A. Overview
  29. A. Overview Chapter 4
  30. A. Overview to Chapter 1
  31. A. Preparation of Viewers’ Report
  32. A. Procedures for Appointing Viewers
  33. A. Record Drawings
  34. A. Recording of Benefits
  35. Acknowledgements
  36. Alternative Tile Intakes (Perforated Risers, Gravel/rock inlets, dense pattern Tile) (NRCS CP 606)
  37. Appendices
  38. Appendix 10: Table of Structures Hydraulic Results
  39. Appendix 11: Rock Chutes Design Guidelines and Design Spreadsheet
  40. Appendix 12: Drainage Law, Buffer Law, and Public Drainage Ditch Buffer Strips (BWSR Drainage Work Group)
  41. Appendix 13: Watershed Planning
  42. Appendix 14: Engineer's Reports
  43. Appendix 1: Checklist for M.S. 103E.015 Criteria
  44. Appendix 1: Checklist for Minn. Stat. § 103E.015 Criteria
  45. Appendix 2: External Sources of Funding
  46. Appendix 2A: Legal Requirements for Each Type of Petition
  47. Appendix 3: Suggested Items in a Concept Plan/Feasibility Study
  48. Appendix 4: Links to Regulatory Agencies Related to Public Drainage
  49. Appendix 5: Van Schilfgaarde Equation and Parameters
  50. Appendix 6: Checklist for Drainage Project Planning, Preliminary Survey, Preliminary Report Guidelines

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)

Privacy policy

Template:Footer