Showing below up to 250 results in range #1 to #250.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)

  1. 1. General Requirements
  2. 1. Introduction
  3. 2. Surface Drainage Project Recommendations
  4. 3. Subsurface Drainage Project Recommendations
  5. A. Acronyms
  6. A. Background and Overview to Chapter 1
  7. A. Chapter Organization
  8. A. Chapter Purpose
  9. A. Determining Benefits for Tribal, Government, or Public Lands
  10. A. Drainage Code Appeals
  11. A. Drainage Liens
  12. A. Easements and Rights-of-Way
  13. A. General
  14. A. General (Section 2. II)
  15. A. General (Section 2. III)
  16. A. General (Section 2. IV)
  17. A. General (Section 2. V)
  18. A. General (Section 2. VI)
  19. A. General (Section 3. II)
  20. A. General (Section 3. III)
  21. A. General (Section 3V)
  22. A. General (Section 3VI)
  23. A. General (Section 3VII)
  24. A. General (Section 3 IV)
  25. A. General (Section II)
  26. A. Introduction to Chapter 2
  27. A. Jurisdiction
  28. A. Overview
  29. A. Overview Chapter 4
  30. A. Overview to Chapter 1
  31. A. Preparation of Viewers’ Report
  32. A. Procedures for Appointing Viewers
  33. A. Record Drawings
  34. A. Recording of Benefits
  35. Acknowledgements
  36. Alternative Tile Intakes (Perforated Risers, Gravel/rock inlets, dense pattern Tile) (NRCS CP 606)
  37. Appendices
  38. Appendix 10: Table of Structures Hydraulic Results
  39. Appendix 11: Rock Chutes Design Guidelines and Design Spreadsheet
  40. Appendix 12: Drainage Law, Buffer Law, and Public Drainage Ditch Buffer Strips (BWSR Drainage Work Group)
  41. Appendix 13: Watershed Planning
  42. Appendix 14: Engineer's Reports
  43. Appendix 1: Checklist for M.S. 103E.015 Criteria
  44. Appendix 1: Checklist for Minn. Stat. § 103E.015 Criteria
  45. Appendix 2: External Sources of Funding
  46. Appendix 2A: Legal Requirements for Each Type of Petition
  47. Appendix 3: Suggested Items in a Concept Plan/Feasibility Study
  48. Appendix 4: Links to Regulatory Agencies Related to Public Drainage
  49. Appendix 5: Van Schilfgaarde Equation and Parameters
  50. Appendix 6: Checklist for Drainage Project Planning, Preliminary Survey, Preliminary Report Guidelines
  51. Appendix 7: Does Your Project Require a Mandatory Environmental Review?
  52. Appendix 8: Key Questions for Considering Water Quality Impacts
  53. Appendix 9: Minnesota Water Quality Standards
  54. B. Authority
  55. B. Authority and Format
  56. B. Chapter History and Background
  57. B. Chapter Purpose
  58. B. Considerations Before Drainage Work is Done
  59. B. Definition of an Adequate Outlet
  60. B. Definitions
  61. B. Description of Viewer Qualifications
  62. B. Detailed Survey
  63. B. Determination of As-Built Condition (Original Grade)
  64. B. Determining the Correct Drainage Authority
  65. B. Disagreement of Viewers
  66. B. Drainage Bond Issues
  67. B. Engineer's Detailed Survey Report
  68. B. Engineering Requirements
  69. B. General (Chapter 2.II)
  70. B. General (Section 2. II)
  71. B. Market-Value Based Benefits
  72. B. New Drainage System Projects
  73. B. Other Environmental Laws, Rules, Regulations, and Ordinances Affecting Drainage
  74. B. Preliminary Survey: Objectives and Limitations
  75. B. Procedure for Awarding the Construction Contract
  76. B. Re-Establishment of Public Drainage Records
  77. B. Recording of Drainage System Order and the Marketable Title Act
  78. B. Review and Approval of Petition by the County Attorney
  79. B. Tax Assessment Appeals
  80. B. Temporary Construction Easements
  81. B. Wetlands
  82. BMP Maintenance Request
  83. BMP Table
  84. Beaver Control Contractor Form
  85. Beaver Control Request Form
  86. C. Accounting
  87. C. Allocation of Benefits for Parcel Splits and Transfers
  88. C. Appointment of the Engineer
  89. C. Basic Requirements of an Adequate Outlet
  90. C. Chapter History and Background
  91. C. Charge-Based Benefits
  92. C. Commissioner's Final Advisory Report
  93. C. Consideration of Income Generating Alternatives
  94. C. Damages for Repairs by Resloping, Incorporating a Multi-Stage Cross-Section, Leveling Spoil Banks, Installing Erosion Control, or Removing Trees
  95. C. Determining the Correct Drainage Authority
  96. C. Engineer's Final Report
  97. C. Extraordinary Remedies
  98. C. Filing Viewers’ Report
  99. C. Improvement of Drainage System
  100. C. Inspection of Drainage Systems
  101. C. Petitioner Liability
  102. C. Preliminary Survey: Recommended Procedure
  103. C. Public Waters
  104. C. Purpose
  105. C. Purposes
  106. C. Relation to Drainage Law and Drainage System Management
  107. C. Requirements of a Petition Adequate to Confer Jurisdiction
  108. C. The Construction Contract and Bond
  109. Can I provide feedback on the new site?
  110. Chapter 1
  111. Chapter 2
  112. Chapter 2 - Section III Templates
  113. Chapter 2 - Section IV Templates
  114. Chapter 2 - Section VIII Templates
  115. Chapter 2 - Section VI Templates
  116. Chapter 2 - Section V Templates
  117. Chapter 2 Templates
  118. Chapter 3
  119. Chapter 3 Appendix
  120. Chapter 4
  121. Chapter 4 - Section III Templates
  122. Chapter 4 - Section VII Templates
  123. Chapter 4 - Section VI Templates
  124. Chapter 4 Templates
  125. Chapter 5
  126. Chapter 6
  127. Conservation Cover (NRCS CP 327)
  128. Conservation Crop Rotations (NRCS CP 328)
  129. Conservation Tillage (NRCS CPs 329, 345, 346)
  130. Constructed (Treatment) Wetland/Constructed Wetland for Storage and Treatment (In-line or Off-channel) (NRCS CP 656)
  131. Contour Bufferstrips (NRCS CP 332)
  132. Contour Farming (NRCS CP 330)
  133. County Drainage Inspector’s Report
  134. Cover Crops (NRCS CP 340)
  135. Culvert Sizing
  136. D. Advisory Review of Detailed Survey Report
  137. D. Advisory Reviews
  138. D. Best Management Practices
  139. D. Crimes Related to Drainage Systems and Penalties
  140. D. Duration of Jurisdiction
  141. D. Engineer's Preliminary Report
  142. D. Engineer's Preliminary Survey Report
  143. D. Engineer's Preliminary Survey and Preliminary Survey Report
  144. D. Environmental Review
  145. D. Funding of Watershed Districts and Projects
  146. D. Hearing for Final Acceptance of Project
  147. D. Improvement of Outlets
  148. D. Methods of Outlet Analysis
  149. D. Multi-Purpose Water Management
  150. D. Non-Petitioned Repair of Drainage Systems
  151. D. Other Laws Impacting Drainage Projects and Repair
  152. D. Process
  153. D. Property Owners’ Report
  154. D. Protection Benefits
  155. D. Relation to Drainage Law and Drainage System Management
  156. D. Requirements of a Petition Adequate to Confer Jurisdiction
  157. D. The Final Hearing
  158. Dam (NRCS CP 402)
  159. Denitrifying Bioreactor (NRCS CP 605)
  160. Ditch Management Checklist (Improvement)
  161. Ditch Repair Call Log
  162. Drainage Inspection Report
  163. Drainage Inspection Report by County Inspector
  164. Drainage Manual Table of Contents
  165. Drainage System Repair Request Form
  166. Drainage Water Management (NRCS CAP 130, CP 587, CP 554)
  167. E. Benefit Considerations for Certain Projects and Proceedings
  168. E. Best Management Practices
  169. E. Commissioner's Preliminary Advisory Report
  170. E. Commissioner's and Board's Preliminary Advisory Report
  171. E. Documentation of Outlet Adequacy
  172. E. Engineer's As-Constructed Survey and Discharge of Duties
  173. E. Engineering Costs for Preliminary Survey and Report
  174. E. Engineering and Environmental Study Costs
  175. E. General Guidance for Use of the MPDM
  176. E. Laterals
  177. E. Making Changes: Engineer's Detailed Survey Report and Viewer's Report
  178. E. Other Laws Impacting Drainage Projects and Repair
  179. E. Other Resources
  180. E. Outlets Out-of-State and Outlets into Minnesota
  181. E. Petitioned Repair of Drainage Systems
  182. E. Petitioner Liability
  183. E. Threatened and Endangered Species
  184. E. Wiki Guidance
  185. Editing export to pdf
  186. Energy Dissipation at Piped Outlets
  187. Example Forms from Local Governments
  188. Exhibit A
  189. Exhibit A: Petition for New Drainage System
  190. Exhibit AA: Petition to Use Drainage System as Outlet
  191. Exhibit AB: Order Setting Hearing on Petition for Outlet
  192. Exhibit AD: Notice of Unauthorized Outlet
  193. Exhibit AE: Petition for Consolidation Division of Drainage System
  194. Exhibit AF: Final Order Consolidating Dividing Drainage Systems
  195. Exhibit AG: Petition for Removal of Property from a Drainage System
  196. Exhibit AH: Notice of Hearing on Property Removal
  197. Exhibit AI: Final Order Removing Property From a Drainage System
  198. Exhibit AJ: Petition for Partial Abandonment
  199. Exhibit AK: Notice of Hearing on Partial Abandonment
  200. Exhibit AL: Final Order on Partial Abandonment
  201. Exhibit AM: Petition for Abandonment
  202. Exhibit B
  203. Exhibit B: Petition for Improvement of Drainage System
  204. Exhibit C
  205. Exhibit C: Petition for Improvement of Outlet
  206. Exhibit D
  207. Exhibit D: Petition for Lateral to Drainage System
  208. Exhibit E
  209. Exhibit E: Petition to Impound Reroute Divert
  210. Exhibit F
  211. Exhibit F: Order Appointing Engineer
  212. Exhibit G
  213. Exhibit G: Notice of Hearing
  214. Exhibit H
  215. Exhibit H: Final Order on Petition to Impound Reroute Divert
  216. Exhibit K
  217. Exhibit K: Order Setting Hearing on Buffer Acquisition
  218. Exhibit M: Petition for Repair
  219. Exhibit O: Final Order on Repair
  220. Exhibit P: Order for Hydraulic Report Hearing
  221. Exhibit Q: Notice of Hydraulic Report Hearing
  222. Exhibit R: Final Order Directing Construction of Bridges/Culverts
  223. Exhibit S: Order for Repair Fund
  224. Exhibit U: Petition for Record Correction
  225. Exhibit V: Resolution to Initiate Record Correction
  226. Exhibit W: Notice of Hearing
  227. Exhibit W: Notice of Hearing on Engineer's Report
  228. Exhibit X: Final Order Reestablishing Drainage System Records
  229. Exhibit Y: Order Initiating Redetermination of Benefits
  230. Exhibit Z: Final Order Confirming Redetermined Benefits
  231. F. Adoption of Final Order
  232. F. Advisory Reviews
  233. F. Contracting and Levying for Maintenance and Repair
  234. F. Duration of Jurisdiction
  235. F. How to Use This Chapter
  236. F. Impounding, Rerouting, and Diverting Drainage System Waters
  237. F. Other Resources
  238. F. Proper Filing of a Petition
  239. F. The Preliminary Hearing
  240. F. Water Quality
  241. G. Bond Must Accompany the Petition
  242. G. Bridges and Culverts
  243. G. Drainage System Repairs
  244. G. How to Use This Chapter
  245. G. Outlets Out-of-State and Outlets into Minnesota
  246. G. Reasons for Dismissal
  247. Grade Stabilization Structure (NRCS CP 410) Reinforced Concrete Weir Spillway
  248. Grade Stabilization Structure (NRCS CP 410) Reticulated Concrete Block Drop Structure
  249. Grade Stabilization Structure (NRCS CP 410) Rock Riffle/Rock Grade Control Structure
  250. Grade Stabilization Structure - Side Inlet (Various Types) (NRCS CP 410)

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)

Privacy policy

Template:Footer