Showing below up to 100 results in range #1 to #100.

View (previous 100 | next 100) (20 | 50 | 100 | 250 | 500)

  1. 1. General Requirements
  2. 1. Introduction
  3. 2. Surface Drainage Project Recommendations
  4. 3. Subsurface Drainage Project Recommendations
  5. A. Acronyms
  6. A. Background and Overview to Chapter 1
  7. A. Chapter Organization
  8. A. Chapter Purpose
  9. A. Determining Benefits for Tribal, Government, or Public Lands
  10. A. Drainage Code Appeals
  11. A. Drainage Liens
  12. A. Easements and Rights-of-Way
  13. A. General
  14. A. General (Section 2. II)
  15. A. General (Section 2. III)
  16. A. General (Section 2. IV)
  17. A. General (Section 2. V)
  18. A. General (Section 2. VI)
  19. A. General (Section 3. II)
  20. A. General (Section 3. III)
  21. A. General (Section 3V)
  22. A. General (Section 3VI)
  23. A. General (Section 3VII)
  24. A. General (Section 3 IV)
  25. A. General (Section II)
  26. A. Introduction to Chapter 2
  27. A. Jurisdiction
  28. A. Overview
  29. A. Overview Chapter 4
  30. A. Overview to Chapter 1
  31. A. Preparation of Viewers’ Report
  32. A. Procedures for Appointing Viewers
  33. A. Record Drawings
  34. A. Recording of Benefits
  35. Acknowledgements
  36. Alternative Tile Intakes (Perforated Risers, Gravel/rock inlets, dense pattern Tile) (NRCS CP 606)
  37. Appendices
  38. Appendix 10: Table of Structures Hydraulic Results
  39. Appendix 11: Rock Chutes Design Guidelines and Design Spreadsheet
  40. Appendix 12: Drainage Law, Buffer Law, and Public Drainage Ditch Buffer Strips (BWSR Drainage Work Group)
  41. Appendix 13: Watershed Planning
  42. Appendix 14: Engineer's Reports
  43. Appendix 1: Checklist for M.S. 103E.015 Criteria
  44. Appendix 1: Checklist for Minn. Stat. § 103E.015 Criteria
  45. Appendix 2: External Sources of Funding
  46. Appendix 2A: Legal Requirements for Each Type of Petition
  47. Appendix 3: Suggested Items in a Concept Plan/Feasibility Study
  48. Appendix 4: Links to Regulatory Agencies Related to Public Drainage
  49. Appendix 5: Van Schilfgaarde Equation and Parameters
  50. Appendix 6: Checklist for Drainage Project Planning, Preliminary Survey, Preliminary Report Guidelines
  51. Appendix 7: Does Your Project Require a Mandatory Environmental Review?
  52. Appendix 8: Key Questions for Considering Water Quality Impacts
  53. Appendix 9: Minnesota Water Quality Standards
  54. B. Authority
  55. B. Authority and Format
  56. B. Chapter History and Background
  57. B. Chapter Purpose
  58. B. Considerations Before Drainage Work is Done
  59. B. Definition of an Adequate Outlet
  60. B. Definitions
  61. B. Description of Viewer Qualifications
  62. B. Detailed Survey
  63. B. Determination of As-Built Condition (Original Grade)
  64. B. Determining the Correct Drainage Authority
  65. B. Disagreement of Viewers
  66. B. Drainage Bond Issues
  67. B. Engineer's Detailed Survey Report
  68. B. Engineering Requirements
  69. B. General (Chapter 2.II)
  70. B. General (Section 2. II)
  71. B. Market-Value Based Benefits
  72. B. New Drainage System Projects
  73. B. Other Environmental Laws, Rules, Regulations, and Ordinances Affecting Drainage
  74. B. Preliminary Survey: Objectives and Limitations
  75. B. Procedure for Awarding the Construction Contract
  76. B. Re-Establishment of Public Drainage Records
  77. B. Recording of Drainage System Order and the Marketable Title Act
  78. B. Review and Approval of Petition by the County Attorney
  79. B. Tax Assessment Appeals
  80. B. Temporary Construction Easements
  81. B. Wetlands
  82. BMP Maintenance Request
  83. BMP Table
  84. Beaver Control Contractor Form
  85. Beaver Control Request Form
  86. C. Accounting
  87. C. Allocation of Benefits for Parcel Splits and Transfers
  88. C. Appointment of the Engineer
  89. C. Basic Requirements of an Adequate Outlet
  90. C. Chapter History and Background
  91. C. Charge-Based Benefits
  92. C. Commissioner's Final Advisory Report
  93. C. Consideration of Income Generating Alternatives
  94. C. Damages for Repairs by Resloping, Incorporating a Multi-Stage Cross-Section, Leveling Spoil Banks, Installing Erosion Control, or Removing Trees
  95. C. Determining the Correct Drainage Authority
  96. C. Engineer's Final Report
  97. C. Extraordinary Remedies
  98. C. Filing Viewers’ Report
  99. C. Improvement of Drainage System
  100. C. Inspection of Drainage Systems

View (previous 100 | next 100) (20 | 50 | 100 | 250 | 500)

Privacy policy

Template:Footer