At this point in a drainage proceeding, substantial financial commitments may have been incurred in developing the preliminary survey and the engineer's preliminary survey report. Therefore, it is recommended that the engineer keep the drainage authority informed as to the costs accrued at various points throughout the preliminary survey and reporting process. At no time can these costs exceed the amount of the bond provided by the petitioners. Additional surety bonds may be needed as work progresses.